Project Profile

Marshall Aerospace

Marshall Aerospace Key Integrated Services

Gallery

The Project

Marshall Aerospace and Defence Group are the UK’s largest independent aerospace and defence company, delivering innovation and excellence in engineering, support solutions and services. Operating from many sites in the UK, the team at Key Integrated Services were a part of a team selected to refurbish one of their buildings at the Kirkby Moorside site.

Project Objectives

The objective of the scheme was to considerably enhance the aged building and remove a considerable amount of asbestos contained within. All the mechanical and electrical services were to be replaced for both the general and process services installations of the space.

Challenges

This particular building was involved with the manufacture of a number of products using advanced composites, all of which were for MOD contracts. The facility could not be shut down, which resulted in a phased completion of the building having to take place. This presented other challenges such as interfacing with live parts of a working site.

Solution

Key Integrated Services worked with the incumbent design team to produce a solution that could be installed and commissioned to suit the phased handover of the building. Extensive surveys took place to assess what services could be modified and when to enable the asbestos facade to be replaced.

The Results

The project was successfully completed without affecting the client’s operations and has immensely enhanced the working and production space on this site. Marshall’s is a prized customer of Key Integrated Services and one we hope to complete many more projects with in the future.

Be part of the Key IS team

Our projects tell the story of our success. Have you got what it takes to help us write tomorrow’s chapter?

If you want to be the best at what you do and to work on projects you can be proud of, a career at Key Integrated Services could be for you.