The Project

For over 50 year,s Soletrader has been bringing the leading brands to the high street, with shops all across the UK. From the first store opening in 1962, to the multi-channel online and offline presence today, Soletrader has continued to grow, while keeping a firm emphasis on exceptional customer service and an unparalleled range of brands for men, women and children.

Project Objectives

With a new store opening in Nottingham, Key Integrated Services were tasked with the design and delivery of the mechanical services installations as apart of the overall fit out. The design involved working with the base build provisions that the shopping centre provided to this particular retail unit.

Challenges

As the fit out was being completed within a space in a live shopping centre, additional health and safety measures had to be implemented. Access in and out of the space had to be restricted to the service corridors running around the perimeter of the shopping centre.

Solution

To utilise the base build provision, a bespoke plate heat exchanger pack was designed and delivered to provide comfort cooling in the space. A purpose built control system was installed to oversee the systems installed.

The Results

This was yet another successful fit out for this ever expanding brand. The store was stocked up and began trading not long after the works were complete.

Be part of the Key IS team

Our projects tell the story of our success. Have you got what it takes to help us write tomorrow’s chapter?

If you want to be the best at what you do and to work on projects you can be proud of, a career at Key Integrated Services could be for you.