Industrial

BAE Building 430 Key integrated services

BAE Building 430

This project was to extend BAE Systems’ existing manufacturing capability. It also incorporated a new access road to link the south side of the Samlesbury site in Lancashire from east to west and refurbishment work within the existing building.

Read More

ABLE UK, Immingham Key integrated services

ABLE UK, Immingham

The project was built as part of Able Humber Port (AHP), AHP is situated on the South bank of the Humber Estuary, East Coast of the UK, which in recent years has been the UK’s fastest growing port and logistics centre. This was an ideal place for BMW to take ownership of a new 6000m² £25million import base. The large building – 175m long and 38m wide – features a huge workshop with inspection, wash, paint, and repair bays, as well as stores and staff welfare areas.

Read More

Project Alpha Bravo - Siemens, Hull

Project Alpha Bravo – Siemens, Hull

Project Alpha Bravo is part of an overall £160 million pound investment by Siemens in wind turbine production and installation facilities in Hull. Making the world’s largest blade in commercial operation at 75 metres in length and weighing 25 tonnes each, the team at Key Integrated Services were appointed mechanical services contractor for the 12,300m2 service and logistics facility.

Read More

amey Key Integrated Services

AMEY, Milton Keynes

AMEY required various electrical installations carrying out including LV panel extension in the main switch room and ATT Building to accommodate new MCCBs, installation of various submains to several locations and 110V&415V maintenance sockets in the ATT Building for use by the site engineers.

Read More

ineos key integrated services

INEOS

INEOS, a British multi-national chemicals company had a requirement to expand their hand sanitiser division in response to the recent COVID19 world pandemic. They chose to convert existing space at their Newton Aycliffe site from a stores building into a state-of-the-art combined production/stores facility, and begin delivering up to a million bottles for free to the health service. With the assistance of Key Integrated Services, the site was set up in ten days to produce hand sanitiser to World Health Organisation (WHO) standards

Read More

Viridor Key Integrated Services

Viridor

Viridor required the installation of new conveyors, shredder, hoppers, and a baler on to an existing glass recycling line to enable recycling of aluminium bottle tops. They also required the installation of a new emergency stop system via a Pilz relay to be integrated into the existing emergency stop system and the design, manufacture, and install of a bespoke control system, via a PLC programmer.

Read More