Project Profile

Mondelez International

Mondelez Key Integrated Services

Gallery

The Project

Mondelez International manufacture some of the world’s best known snacks. Key Integrated Services were selected to design and install the mechanical services on a new production line for a new sugar free product at their manufacturing site in Sheffield.

 

Project Objectives

The main objectives were to install new close control HVAC systems to maintain the production areas at a constant temperature and low humidity. Other services included Domestic Hot & Cold Water, Steam & Condensate, Compressed Air and a new Chilled Water system that served both the HVAC and Process Equipment.

Challenges

The project was undertaken in an existing live factory. Careful planning and preparation was required in order to maintain live production in adjacent areas without compromising hygiene standards, health and safety or production output.

Solution

Key Integrated Services developed the original client brief into a fully designed scheme that incorporated the service tie-ins and services routing to avoid impacting on live production. Our project team worked closely with the client’s management to ensure the highest standards were always maintained despite the challenging working environment.

The Results

The project was delivered on time and budget to enable our valued client to commence product testing to their planned timeline.

Be part of the Key IS team

Our projects tell the story of our success. Have you got what it takes to help us write tomorrow’s chapter?

If you want to be the best at what you do and to work on projects you can be proud of, a career at Key Integrated Services could be for you.