Reckitt Benkiser
Our client is an international healthcare manufacturing business that produces numerous well known healthcare brands. KeyIS were employed directly to provide a turn-key solution to design and upgrade the close control HVAC systems serving the manufacturing lines that produce medicated lozenges.
Project Objectives
To provide a robust controlled environment capable of maintaining the internal temperature and humidity conditions 365 days a year regardless of the ambient conditions.
Challenges
To undertake the project in a live GMP environment to a demanding timeframe whilst keeping the manufacturing downtime to a minimum.
Solution
Key Integrated Services completed an extensive consultation and pre-construction process with the client to ascertain the existing issues and future requirements of the facility. From this, the specialist HVAC services were designed, upgraded/installed and commissioned. Additional services upgraded were steam, condensate, chilled water, BMS controls and DX cooling.
The Results
The project was another successful delivery for our client and provided them with the correct environment to increase output of the product and reduce waste. The job was completed to the highest standard on time and on budget. Key Integrated Services look forward to continued success with this valued client.